


The Bielefeld Public Utility Company Ltd.
New Development CHP Bielefeld
Bielefeld Public Utility Company
Bielefeld
Axel Peske, Graduate Engineer
Markus Linnenberg, Graduate Engineer
Complete Architectural Design
Layout Planning
Building Services
138,800 m3
PUNKTEINS played an active role in the conception and preliminary development of a unified architectural solution for the newly planned CHP (combined heat and power plant). PUNKTEINS’ separate elements were involved during the very early stages of system concept development for the new power plant. Its many years of experience in industrial construction, specifically the optimization of outlet flow and the use of synergy effects were invaluable.
The planning and drafting was further developed as commissioned by the syndicate - PUNKTEINS Ltd. /Steinmüller Engineering Ltd. / Jander Energietechnik Inc. The planning area for PUNKTEINS, architecture and building services planning was applied to the plant layout and the cost was determined.
Responsibility for the architectural and building services planning included plant layout and determining a budget.
Elements worked on by PUNKTEIN:
- Architectural and urban form
- Boiler house with coal storage bunker and exhaust treatment facility
- Turbine house
- Air condensers
- Coal silo
- Wagon Unloading Facility
- Exterior construction